I-605 at Valley Bl Improvements Project
This project’s operational and safety improvements include reconfiguring and widening freeway ramps; constructing freeway retaining and sound walls; upgrading signals (traffic and railroad); reconstructing pavement; and upgrading curb ramps, sidewalks, railroad gates and other vehicular/railroad/pedestrian facilities to improve mobility and local traffic circulation.
Overview

Location: San Gabriel Valley
Phase: Design & Engineering
Type: Less Traffic
This project’s operational and safety improvements include reconfiguring and widening freeway ramps; constructing freeway retaining and sound walls; upgrading signals (traffic and railroad); reconstructing pavement; and upgrading curb ramps, sidewalks, railroad gates and other vehicular/railroad/pedestrian facilities to comply with current ADA standards and improve mobility and local traffic circulation.
Status
The environmental phase of the Project was completed last year. The Plans, Specifications and Estimate [PS&E] or the design phase of the Project is currently underway pending the availability of construction funding.
Documents
Contact Us
Email: i605corridor@metro.net
Project Phone number: 213-922-3057
Scroll Spy here